Looking to power up your presence? Order your electrical needs in this section. And here are a few points to remember:
ELECTRICAL TIPS:
1. All power comes from the ground unless you order it otherwise.
2. Music City Center (MCC/TEG) uses round cords for all electrical drops. If you require flat cords, you must provide your own and MCC/TEG can install them for you. However, you will be charged additional labor (often double the amount for the standard round cords) to do so.
3. Machines should come with their own cord caps and they should be removable. The facility does not have any cord caps for rental.
4. All standard outlets will be laid hot including overhead power for hanging signs. Hard-wired connections (208V or more) will not.
5. If you require a hard-wired connection (208 Volt or more) you are able to preschedule this install service in advance. On your electrical order form you can indicate the date and time for installation. Please also indicate whether or not that connection will need to be hot at that time. If you do not wish to preschedule, please see The Expo Group Service Desk to let us know you are ready for your hard-wired connection to become hot.
6. At the break of the show power will continue to stay on while machines are being powered down. If you would like to preschedule your hard-wired disconnect, please let us know when on your electrical order form.
7. Please make sure to indicate your “Main Drop” location on your floorplan.
8. Please make sure all floorplans indicate orientation.
9. For 120 Volt orders, labor is included if being installed in the most convenient location. For linear booths, this is the back middle of the booth. For island booths, it will be the on top of the most convenient floor pockets to the booth. If you require custom placement, labor and materials will be an additional charge.
10. Exhibitors must furnish all 208V and 480V male and female plugs.
11. If you are bringing new technology such as LED screens, AI, VR and similar or more machinery, consider updating your electrical budget.
12. Machinery must bring their own tails and the MCC/TEG will hardwire to it.
13. Orders will NOT be considered without an attached floorplan. You can make edits to the floorplan should you need to, but we are unable to process the order without a corresponding floorplan. After the initial submission, there is a $100 fee per change.
14. 24-Hour Service: Add 50% to service requirement charge. When 24-hour service is NOT required, exhibitor is expected to turn equipment off at the end of the day or 24-hour service will be charged.
ELECTRICAL FAQs:
1. Do they turn off power once it’s laid?
A. Power does not turn off unless requested.
2. If 24-hour power is NOT ordered, but their equipment (lights/machine/sign rotates) are not turned off, do you end up charging for it?
A. NO.
3. If a hanging sign requires electrical, what department takes the lead?
A. Rigging
4. Will high-voltage items be hard wired?
A. 480 power is always a hard wired connection. 208 power may not be.